Case Studies

Documented field results, not marketing claims.

Every deployment below was measured against pre-application baselines using independent engineering review. Scope, traffic loading, commissioning windows, and lifecycle savings are reported as observed.

Mining·Northern Nevada, USA·2025

12.4 km haul road stabilized — 62% drop in water-truck cycles.

A high-throughput open-pit mine replaced calcium chloride dust control on its primary haul road with a single Build A Road® stabilization pass. Within 90 days, water-truck cycles fell from 11/day to 4/day and grading frequency dropped from twice-weekly to monthly.

62%

Reduction in water-truck cycles

8x

Longer interval between re-grades

$1.9M

Year-one OPEX savings (est.)

Read case study
Forestry·Interior British Columbia, Canada·2024

All-season access on a 38 km forestry mainline — no chloride, no rebuild.

A licensee operating in moisture-sensitive boreal terrain needed a year-round mainline without chloride-based palliatives near salmon-bearing streams. Build A Road® stabilized the running surface for four wet seasons without re-application.

100%

All-season uptime since application

0

Re-applications in 4 years

47%

Reduction in haul-cycle time variance

Read case study
Solar Farms·West Texas, USA·2025

320 MW construction site — dust eliminated on 41 km of internal access.

Panel installation and tracker maintenance crews on a 320 MW PV site were losing productive hours to dust-related shutdowns. Build A Road® stabilized 41 km of internal access in a single mobilization, eliminating dust events and protecting tracker bearings.

94%

Reduction in water consumption

38%

Drop in panel-cleaning frequency

0

Dust-related shutdowns post-application

Read case study
County Roads·Upper Midwest, USA·2024

County converts 78 mi of gravel road to stabilized surface — 51% lifecycle savings.

A rural county piloted Build A Road® across a 78-mile gravel road network as an alternative to chip-seal upgrades. Independent engineering review documented 51% lower 10-year lifecycle cost vs. baseline maintenance and a measurable drop in resident complaints.

51%

10-year lifecycle cost reduction

73%

Drop in dust-related complaints

4x

Longer grading interval

Read case study